Nike Recovery Room - UT
University of Texas at Austin
Commercial Build-Out
•
3 Week Timeline
•
2024
The Challenge
LFM was selected to build a custom recovery room at The University of Texas at Austin, delivered in collaboration with Nike and commissioned by CustomED.Completed in three weeks, this project required a high level of coordination, precision, and execution—from early planning through final installation. The goal was to create a performance-driven space that supports athlete recovery while meeting the design and brand standards of a world-class institution.Our team managed the build from concept to completion, overseeing layout execution, detailed installation, and on-site coordination to ensure a seamless result within a tight timeline. The finished space reflects a balance of function, durability, and clean design—built to perform at a high level every day.This project represents the type of work LFM specializes in: commercial environments where details matter, timelines are tight, and expectations are high.
LFM was selected to build a custom recovery room at The University of Texas at Austin, delivered in collaboration with Nike and commissioned by CustomED.Completed in three weeks, this project required a high level of coordination, precision, and execution—from early planning through final installation. The goal was to create a performance-driven space that supports athlete recovery while meeting the design and brand standards of a world-class institution.Our team managed the build from concept to completion, overseeing layout execution, detailed installation, and on-site coordination to ensure a seamless result within a tight timeline. The finished space reflects a balance of function, durability, and clean design—built to perform at a high level every day.This project represents the type of work LFM specializes in: commercial environments where details matter, timelines are tight, and expectations are high.
LFM was selected to build a custom recovery room at The University of Texas at Austin, delivered in collaboration with Nike and commissioned by CustomED.Completed in three weeks, this project required a high level of coordination, precision, and execution—from early planning through final installation. The goal was to create a performance-driven space that supports athlete recovery while meeting the design and brand standards of a world-class institution.Our team managed the build from concept to completion, overseeing layout execution, detailed installation, and on-site coordination to ensure a seamless result within a tight timeline. The finished space reflects a balance of function, durability, and clean design—built to perform at a high level every day.This project represents the type of work LFM specializes in: commercial environments where details matter, timelines are tight, and expectations are high.
- What made this project difficult or unique
- Client requirements and expectations
- Constraints (timeline, coordination, brand standards)

Our Approach
• Planning & coordination process
• Key decisions made
• Timeline management
• Stakeholder collaboration
The Solution
• Specific work performed
• Materials and techniques
• Quality control measures
• Problem-solving examples

✓
Completed On Time
3
Weeks Timeline
100%
Brand Compliance
"LFM delivered exceptional results on an extremely tight timeline. The attention to detail and professionalism throughout the project was outstanding."
— Project Manager Name
Nike / CustomED